Dental practice: partitions and insulation

Dental practice fit-out in progress: metal stud partitions, insulation, plasterboard and exposed ceiling services.

Dental practice under construction: metal stud walls, plasterboard and a mobile scaffold.
Dental practice under construction: metal stud walls, plasterboard and a mobile scaffold.
Bare dental practice shell: walls marked "CAB1" and "CAB2", exposed services and screed.
Bare dental practice shell: walls marked "CAB1" and "CAB2", exposed services and screed.
Insulated practice partition: mineral wool between metal studs, doorway and plasterboard.
Insulated practice partition: mineral wool between metal studs, doorway and plasterboard.
Same insulated wall from the corridor: OSB-clad corner, open doorway and exposed ceiling frame.
Same insulated wall from the corridor: OSB-clad corner, open doorway and exposed ceiling frame.
Practice front room during works: grille-protected window, exposed ceiling services and wrapped A/C unit.
Practice front room during works: grille-protected window, exposed ceiling services and wrapped A/C unit.

Project story

The work, photo by photo

The practice is a building site. Metal studs mark out the future rooms under a metal ceiling frame, with a mobile scaffold tower in the middle.

The walls still carry the plan markings — « AB1 », « CAB1 », « CAB2 » — and the screed is bare. Conduits, sprinkler pipes and insulated pipework stay exposed at ceiling level.

The partitions take their mineral wool before the plasterboard. The grille-protected front window and the wrapped A/C unit wait for the next stage.