A full renovation carried out in order: demolition, structure, services, floors and finishes. One schedule, one detailed quote and one point of contact from the first survey to handover.

Renovated apartment hallway: white walls and doors, floor protected with board and a view into the kitchen at the far end.

The service

What we take on

The order of work decides the result of a full renovation: open up first, redo the services next, close and finish last. We set that schedule before the first wall comes down and keep it current with you.

On site, walkways stay usable, rubble leaves as work progresses and finished work is protected. When a discovery changes the plan — a wall that differs from the drawings, an installation that has to be redone — we set out the options and their cost before carrying on.

We work across Belgium. Our main markets are Brussels, Ganshoren, Ixelles, Waterloo, Antwerp, Leuven, Wavre, Ghent and Liège. More than 7 regions are covered. Give your postcode in the quote request so we can place your address.

Before you start

Frequently asked questions

The questions we hear most often before quoting.

Gallery

4 photos

Full renovation in progress: opening cut through a wall, rubble and red floor markings.
Room during demolition: exposed blockwork, hanging electrical conduits and a site bucket on the floor.
Finished walk-in shower: glass panel, grey tiling and a scalloped-tile niche.
The same hallway from the other end, with indirect niche lighting and boxes on the floor.

Quote

A detailed quote, item by item

Describe the job in a few lines. We arrange a visit, then price the items, the quantities and the VAT.