Skip to content

Project

Full renovation: demolition and opening

Full renovation: opening cut through a wall, rubble removed, partitions and services rebuilt.

Full renovation in progress: opening cut through a wall, rubble and red floor markings.
Full renovation in progress: opening cut through a wall, rubble and red floor markings.
Room during demolition: exposed blockwork, hanging electrical conduits and a site bucket on the floor.
Room during demolition: exposed blockwork, hanging electrical conduits and a site bucket on the floor.

Project story

The work, photo by photo

Two views of the same job. An opening has been cut through a wall; the rubble has not been removed yet and red markings show on the screed.

In the second view only the blockwork, the surface conduits and a floor covered in dust remain. A bucket and tools stand in the foreground.

Partitions and services were still to be rebuilt: these photos mark the starting point of the job.

Projects

See our work

Quote

A comparable project?

Send a few photos and the constraints of the space. We reply with a site visit and a detailed quote.