Skip to content

Project

Bathroom: before / after and shower

Bathroom: strip-out, partitions and moisture-resistant boards, scalloped tiles, finished walk-in shower.

Bathroom before works: metal studs, bare walls and exposed water pipes.
Bathroom near completion: scalloped tiles laid, grey plaster and visible connections.

Both views side by side, or one at full size.

Finished walk-in shower: glass panel, grey tiling and a scalloped-tile niche.
Finished walk-in shower: glass panel, grey tiling and a scalloped-tile niche.
Bathroom under construction: green moisture-resistant plasterboard, cut niche and exposed cables.
Bathroom under construction: green moisture-resistant plasterboard, cut niche and exposed cables.

Project story

The work, photo by photo

The same room, before and after. On one side, metal studs and bare walls; on the other, pale-green scalloped tiles on one wall and grey plaster on the rest.

Between the two stages, the partitions were built and clad in green moisture-resistant plasterboard. A niche is cut for the shower and the conduits run inside the partitions.

The walk-in shower is finished: white tray level with the floor, glass panel, large grey tiles and a niche in scalloped tiles. The taps are fitted.

Projects

See our work

Quote

A comparable project?

Send a few photos and the constraints of the space. We reply with a site visit and a detailed quote.